T-330/26 R - Tribunal Geral
Tribunal GeralTGUE
Relator: M. van der Woude
Processo: T-330/26 R
Despacho
Descritores: Application for interim measures, Public procurement, Exclusion from public procurement procedures governed by Regulation (EU, Euratom) 2024/2509 or from being selected to implement EU funds, Publication of information, Application for suspension of operation of a measure, Prima facie case, Urgency, Balancing of interests
ECLI: ECLI:EU:T:2026:562
Data de Entrada: 29/05/2026
Fontes: TJUE: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:62026TO0330(01)TJUE: https://infocuriaws.curia.europa.eu/blob/download-file-html/T/2026/T_0330_26_00000000RD_01_R_01/326615-EN-1.html
Texto
ORDER OF THE PRESIDENT OF THE GENERAL COURT 14 September 2026 () ( Application for interim measures – Public procurement – Exclusion from public procurement procedures governed by Regulation (EU, Euratom) 2024/2509 or from being selected to implement EU funds – Publication of information – Application for suspension of operation of a measure – Prima facie case – Urgency – Balancing of interests ) In Case T‑330/26 R, TH, represented by M. Bowsher, R. Mehta, Barristers, L. Goddeau and R. Nieuwmeyer, lawyers, applicant, v European Commission, represented by T. Isacu de Groot, A. Koričić and P. Rossi, acting as Agents, defendant, THE PRESIDENT OF THE GENERAL COURT having regard to the order of 19 June 2026, TH v Commission (T‑330/26 R, not published), makes the following Order By its application under Articles 278 and 279 TFEU, the applicant, TH, seeks suspension of the operation of Article 2 of Commission Decision Ares(2026) 3019837 of 20 March 2026, excluding it from participating in award procedures governed by Regulation (EU, Euratom) 2024/2509 of the European Parliament and of the Council of 23 September 2024 on the financial rules applicable to the general budget of the Union (OJ L, 2024/2509), and from being selected to implement EU funds (‘the contested decision’). Background to the dispute and forms of order sought by the parties The applicant is a company governed by [confidential] () law. On [confidential], the Directorate-General for Research and Innovation of the European Commission, acting in its capacity as authorising officer, issued the call for tenders [confidential] in the context of the ‘Horizon Europe’ Framework Programme for Research & Innovation (‘the call for tenders’). In April 2024, the applicant, as a sub-contractor, took part in the call for tenders. On 15 April 2024, the applicant signed a declaration on honour in relation to the selection and exclusion criteria, in which it confirmed that it was not in any of the exclusion situations. By email of 20 November 2024, the Commission sent the lead tenderer requests for information, including in relation to the applicant. Since the Commission had found information in the public domain on several fines which the [confidential], it wished to obtain full details of all those fines, including those imposed by [confidential], along with details of the remedial measures taken. On 2 December 2024, the lead tenderer replied to the Commission, for and on behalf of the applicant. On 14 July 2025, the applicant received a letter sent on behalf of a panel constituted under Article 145 of Regulation 2024/2509 (‘the panel’), in which the panel stated, as a preliminary point, that the applicant had rendered two false or misleading declarations concerning the lack of any exclusion situation, such that grave professional misconduct had been made out, and recommended (i) that the applicant be excluded, for a period of three years, from participating in award procedures governed by Regulation 2024/2509 and from being selected to implement EU funds; (ii) that it be registered in the database of the Early Detection and Exclusion System (EDES); and (iii) that information in relation to the exclusion decision be published on the Commission’s website. On 20 March 2026, the Commission issued the contested decision, for the most part adopting the recommendations of the panel. It concluded that the two instances of misdeclaration constituted a single and continuous situation of grave professional misconduct and, since that conduct was then not recurrent, it decided to reduce the exclusion period to two and a half years. Article 2 of the contested decision states that the information relating to the exclusion would be published on the Commission’s public website, pursuant to Article 142(1) of Regulation 2024/2509, three months after notification of that decision. By application lodged at the Registry of the General Court on 29 May 2026, the applicant brought an action seeking annulment of the contested decision. By separate document lodged at the Court Registry on the same day, the applicant brought the present application for interim measures, in which it claims, in essence, that the President of the General Court should: – order suspension of the operation of Article 2 of the contested decision; – reserve the costs. In its observations on the application for interim measures, which were lodged at the Court Registry on 12 June 2026, the Commission contends that the President of the General Court should: – dismiss the application for interim measures; – order the applicant to pay the costs. Law General considerations It is apparent from reading Articles 278 and 279 TFEU together with Article 256(1) TFEU that the judge hearing an application for interim measures may, if he or she considers that the circumstances so require, order that the operation of a measure challenged before the General Court be suspended or prescribe any necessary interim measures, pursuant to Article 156 of the Rules of Procedure of the General Court. Nevertheless, Article 278 TFEU establishes the principle that actions do not have suspensory effect, since acts adopted by the institutions of the European Union are presumed to be lawful. It is therefore only exceptionally that the judge hearing an application for interim measures may order the suspension of operation of an act challenged before the General Court or prescribe any interim measures (order of 19 July 2016, Belgium v Commission, T‑131/16 R, EU:T:2016:427, paragraph 12). The first sentence of Article 156(4) of the Rules of Procedure provides that applications for interim measures are to state ‘the subject matter of the proceedings, the circumstances giving rise to urgency and the pleas of fact and law establishing a prima facie case for the interim measure applied for’. The judge hearing an application for interim relief may order suspension of operation of an act and other interim measures, if it is established that such an order is justified, prima facie, in fact and in law, and that it is urgent in so far as, in order to avoid serious and irreparable harm to the applicant’s interests, it must be made and produce its effects before a decision is reached in the main action. Those conditions are cumulative, and consequently an application for interim measures must be dismissed if any one of them is not satisfied. The judge hearing an application for interim measures is also to undertake, when necessary, a weighing of the competing interests (see order of 2 March 2016, Evonik Degussa v Commission, C‑162/15 P-R, EU:C:2016:142, paragraph 21 and the case-law cited). In the context of that overall examination, the judge hearing the application has a wide discretion and is free to determine, having regard to the specific circumstances of the case, the manner and order in which those various conditions are to be examined, there being no rule of law imposing a pre-established scheme of analysis within which the need to order interim measures must be assessed (see order of 19 July 2012, Akhras v Council, C‑110/12 P(R), not published, EU:C:2012:507, paragraph 23 and the case-law cited). Having regard to the material in the case file, the President of the General Court considers that he has all the information needed to rule on the application for interim measures without there being any need first to hear oral argument from the parties. In the circumstances of the present case, it is appropriate first to examine the condition relating to a prima facie case. The condition relating to a prima facie case According to settled case-law, the prima facie case requirement is satisfied where at least one of the pleas in law put forward by the party seeking interim measures in support of the main action appears, prima facie, not unfounded. That is the case where one of the pleas relied on reveals the existence of a major legal or factual disagreement whose solution is not immediately obvious and therefore calls for a detailed examination which cannot be carried out by the judge hearing the application for interim measures but must be the subject of the main proceedings (see, to that effect, order of the Vice-President of the Court of 3 December 2014, Greece v Commission, C‑431/14 P-R, EU:C:2014:2418, paragraph 20 and the case-law cited, and order of the President of the Court of 1 March 2017, EMA v MSD Animal Health Innovation and Intervet international, C‑512/16 P(R), not published, EU:C:2017:149, paragraph 59 and the case-law cited). In the present case, in order to demonstrate that the contested decision is, prima facie, vitiated by illegality, the applicant puts forward five pleas in law. It is appropriate to examine, first of all, the first plea, by which the applicant claims that the Commission failed properly to apply Article 138(1)(c) of Regulation 2024/2509 when approaching the concept of ‘grave professional misconduct’ and conflated two grounds for exclusion. By the first part of its first plea in law, the applicant claims that the Commission failed to take into account its argument that the regulatory decisions made by the [confidential] did not establish that grave professional misconduct had occurred inasmuch as, in each of those decisions, the authority concerned had made no finding on wrongful intent, gross negligence or even recklessness. The applicant states that the Commission found there to be ‘grave professional misconduct’ solely on the ground that regulatory decisions adopted by [confidential] had been given against the applicant. The Commission took that approach in spite of the applicant’s explanations that, pursuant to the legislation applicable [confidential], the imposition of fines does not necessarily constitute ‘grave professional misconduct’ for the purposes of the case-law of the General Court. Consequently, in the applicant’s submission, the Commission was wrong not to recognise that the regulatory decisions adopted by the [confidential] did not establish that grave professional misconduct had occurred or, at the very least, that the applicant could reasonably take the view that those decisions did not establish such an occurrence, why is why it did not refer to them in its declaration on honour. By the second part of its first plea, the applicant claims that the Commission expressly found against it, not on account of the content of the regulatory decisions adopted by the [confidential], but the fact that the applicant had failed to disclose those decisions. In the applicant’s submission, the Commission thus conflated the two grounds. It therefore disregarded the fact that the wrongdoing for which Article 138(1)(c) of Regulation 2024/2509 provides is to be established by final administrative decision, and not to have potentially occurred at the time of the declaration on honour. The Commission disputes the applicant’s arguments. The Commission recalls that the ground for exclusion set out in paragraph 49 of the contested decision is not the one resulting from the decisions of the [confidential], but the one of the applicant’s failure to inform the contracting authority about the administrative decisions in the course of its participation in the call for tenders. Furthermore, the Commission contends that it did not conflate two different grounds for exclusion, since the reference to the decisions of the [confidential] were intended to note that these were to be considered as final administrative decisions pursuant to Article 2(28) of Regulation 2024/2509 and, accordingly, the applicant would have had to disclose them. The Commission takes the view that such decisions constituted the pre-requisite of truthful declarations that the applicant should have made when submitting its declaration on honour. The failures to disclose them gave rise to the ground that justified the exclusion under the contested decision. In that connection, it should be recalled that Article 138(1)(c) of Regulation 2024/2509 provides as follows: ‘1. The authorising officer responsible shall exclude a person or entity referred to in Article 137(2) from participating in award procedures governed by this Regulation or from implementing Union funds where that person or entity is in one or more of the following exclusion situations: … (c) it has been established by a final judgment or a final administrative decision that the person or entity is guilty of grave professional misconduct by having violated applicable laws or regulations or ethical standards of the profession to which the person or entity belongs, or by having engaged in any wrongful conduct which has an impact on its professional credibility where such conduct denotes wrongful intent or gross negligence, including, in particular, any of the following: (i) fraudulently or negligently misrepresenting information required for the verification of the absence of grounds for exclusion or the fulfilment of eligibility or selection criteria or in the implementation of the legal commitment; …’ In recitals 51 and 52 of the contested decision, the authorising officer by delegation stated that the misconduct on the part of the applicant ‘consisted of two incorrect statements to the contracting authority rendered on two separate instances in the course of its participation in the same tender procedure [by] (i) not disclosing in the Declaration on Honour signed on 15 April 2024, when [Regulation (EU, Euratom) 2018/1046 of the European Parliament and of the Council of 18 July 2018 on the financial rules applicable to the general budget of the Union, amending Regulations (EU) No 1296/2013, (EU) No 1301/2013, (EU) No 1303/2013, (EU) No 1304/2013, (EU) No 1309/2013, (EU) No 1316/2013, (EU) No 223/2014, (EU) No 283/2014, and Decision No 541/2014/EU and repealing Regulation (EU, Euratom) No 966/2012 (OJ 2018 L 193, p. 1)] was applicable, that [the applicant] was the addressee of several fining decisions; and, (ii) omitting to mention, when [it] replied to the Clarification Request on 2 December 2024, when [Regulation 2024/2509] was applicable, that it had been the addressee of the fine issued by [confidential] and the one issued by [confidential]’. The authorising officer by delegation added that ‘[the Commission considered] that two instances of misdeclaration constitute[d] a single and continuous misconduct which [had] ended on 2 December 2024’. The applicant claims that it cannot have fraudulently or negligently misrepresented information required for the verification of the absence of grounds of exclusion at the declaration on honour stage. It was not in an exclusion situation, nor did it have any reason to believe it was in such a situation. First, the applicant maintains that there had been no final judgment nor any final administrative decision made against it, such that at that stage it had not fraudulently or negligently misrepresented information. Second, there had been no prima facie classification of its conduct as ‘grave professional misconduct’ by the panel referred to in Article 145 of Regulation 2024/2509, in accordance with Article 138(3) of that regulation. Third, the applicant reasonably believed, and at minimum did not negligently or fraudulently believe, that the regulatory decisions did not represent grave professional misconduct. The Commission contends that the applicant’s misconduct lies in the fact that it failed to disclose its exclusion situation, which must be categorised as grave professional misconduct in accordance with Article 138(1)(c)(i) of Regulation 2024/2509. However, the answer to the question whether the way in which the requirement of ‘grave professional misconduct’ is to be applied to the regulatory decisions in question in the present case is not self-evident. A thorough examination of all the relevant circumstances of the case and the related documents cannot be carried out in proceedings for interim measures, but is the responsibility of the court adjudicating on the substance. It follows from the foregoing that, without prejudging the decision of the Court in the main action, it must be concluded that the applicant’s arguments, put forward in the context of the first plea, appear, prima facie, not unfounded within the meaning of the case-law cited in paragraph 19 above. It must therefore be found that there is a prima facie case. The condition of urgency In order to determine whether the interim measures sought are urgent, it should be noted that the purpose of the procedure for interim relief is to guarantee the full effectiveness of the future final decision, in order to prevent a lacuna in the legal protection afforded by the Courts of the European Union. To attain that objective, urgency must generally be assessed in the light of the need of an interlocutory order to avoid serious and irreparable damage to the party requesting the interim measures. That party must demonstrate that it cannot await the outcome of the main proceedings without suffering serious and irreparable damage (see, to that effect, order of 14 January 2016, AGC Glass Europe and Others v Commission, C‑517/15 P-R, EU:C:2016:21, paragraph 27 and the case-law cited). It is in the light of those criteria that it must be examined whether the applicant has succeeded in demonstrating urgency. In the present case, the applicant claims that the publication of information relating to its exclusion, in so far as that information can be accessed by the general public for the duration of that exclusion, that is to say, two and a half years, is such as to cause the applicant to suffer serious and irreparable damage. In the first place, the applicant submits that the publication of the decision on a platform accessible to the general public will have a severe impact on its reputation, both directly and indirectly. The applicant has serious concerns regarding the effect of the contested decision on the ability of its partner firms in the network of the group to which the applicant belongs to tender for future opportunities. In the second place, according to the applicant, the damage resulting from such a publication is not capable of being entirely erased by pecuniary compensation, nor can it be removed a posteriori in the event of annulment of the contested decision. It is an inevitable consequence that the applicant cannot know the opportunities or contracts it has lost as a result of the contested decision. The damage is unquantifiable, and therefore irreparable. In the third place, the applicant maintains that the damage is made further irreparable by the fact of its irreversible nature. Once information has been made accessible to the public, its non-public nature cannot be restored, even if the decision is annulled. The Commission disputes the applicant’s arguments. In the first place, the Commission points out that the applicant is challenging only the publication of the information relating to the exclusion, but not the exclusion itself. It follows that, even if the publication is suspended, the applicant would nonetheless incur the loss of opportunity to conclude new contracts, because of the exclusion, which would continue to be in effect. The damaging effects of the contested decision would only result from the exclusion and not from the publication itself. The Commission therefore asks the Court to consider that the damage that the applicant would suffer in case its application is dismissed, is alternatively limited to the sole reputational damage, since the material damage suffered would result from the exclusion itself. In the second place, the Commission contends that any damage allegedly resulting from the loss of an opportunity to conclude new contracts is neither irreparable nor incapable of assessment. Such damage is, by its nature, foreseeable. Consequently, any damage of that kind is pecuniary in nature and may, where appropriate, be compensated through an award of damages. In the third place, the Commission submits that, although, at the interlocutory stage, the possibility of subsequently obtaining compensation for damage of a pecuniary nature such as the one deriving from lost contract opportunities, if an action for damages is brought following annulment of the contested measure, is necessarily uncertain, it will be possible, in the present case, to monitor the number of contract awards in the restricted audit sector and determine those contracts which the applicant would have had a probability of being awarded, so that damage would eventually be determined. In the fourth place, in so far as concerns the specific argument that the reputational damage resulting from a publication is a priori irreversible because once the information contained in the publication concerned has been made available, its non-public nature can no longer be restored, the Commission submits that where the applicant should prevail in the main proceedings, the Commission would publish the information about the judgment of the Court in question and the non-exclusion of the applicant on the ground referred to in the contested decision on its public website for a period of two and a half years, as a measure to comply with that judgment in accordance with Article 268 TFEU. In that case, the Commission would publish the information about the ‘acquittal’ of the applicant pursuant to Article 142(1) of Regulation 2024/2509. Therefore, should the Court annul the contested decision, the Commission would publish the information that the addressee was not responsible for acts previously incorrectly qualified as grave professional misconduct and thus fully restore its reputation. In conclusion, the Commission asks the Court to find that the damage allegedly suffered by the applicant, in terms of it being potentially discredited as a result of the publication of the information concerned on the Commission’s website, could be effectively remedied by the subsequent publication of information relating to its exoneration and that, consequently, such damage should not be regarded as irreparable. In that connection, in the first place, as regards the applicant’s argument that the publication of the decision to exclude it for two and a half years from EU public procurement procedures would have a severe impact on its reputation, both directly and indirectly, it must be stated that that publication is not a communication limited to the sphere of the EU institutions. It is true that, in the context of the EDES database, Article 144(5) of Regulation 2024/2509 provides that all persons and entities involved in budget implementation in accordance with Article 62 of that regulation are to be granted access by the Commission to the information on decisions on exclusion made pursuant to Article 138 thereof. However, contrary to the registration in the EDES database, which is intended only for internal use and is accessible only to authorised users, not to all authorities (see, to that effect, order of 8 May 2024, Lattanzio KIBS and Others v Commission, T‑113/24 R, not published, EU:T:2024:306, paragraph 44), the publication at issue in the present case is accessible to the general public. Accordingly, if the application for interim measures is dismissed, when such publication takes place, it will be likely to have a significant impact on the applicant’s reputation and, consequently, to place it in a situation in which the continuation of its activities may be jeopardised, with potentially irreversible consequences for its organisational structure, its workforce and its market presence. That situation is all the more harmful since the information at issue remains available on the internet for the entire duration of the exclusion, that is to say, for two and a half years. It is of little importance, in that regard, that the contested decision is not disclosed to the public, given that the absence of any justification concerning the errors committed by the applicant is likely to fuel speculation on the part of the public (see, to that effect, order of 7 August 2025, JB v EUSPA, T‑281/25 R, not published, EU:T:2025:782, paragraph 86). It follows that the damage which the applicant risks suffering in the event of disclosure of that information must be regarded as irreparable. In the second place, as regards the applicant’s argument that the damage resulting from the publication of an exclusion decision is not quantifiable and is therefore irreparable, it must be borne in mind that, admittedly, damage of a financial nature cannot, otherwise than in exceptional circumstances, be regarded as irreparable since, as a general rule, pecuniary compensation is capable of restoring the aggrieved person to the situation that obtained before that person suffered the damage. That is, however, not the case, and such damage can then be deemed to be irreparable, if it cannot be quantified (see order of 2 March 2016, Evonik Degussa v Commission, C‑162/15 P-R, EU:C:2016:142, paragraph 92 and the case-law cited). It is true that the uncertainty of obtaining compensation for pecuniary damage if an action for damages is brought cannot in itself be regarded as a factor capable of establishing that such damage is irreparable within the meaning of the case-law of the Court of Justice. At the interlocutory stage, the possibility of subsequently obtaining compensation for pecuniary damage if an action for damages is brought following annulment of the contested measure is necessarily uncertain. Interlocutory proceedings are not intended to act as a substitute for an action for damages in order to remove that uncertainty, since their purpose is only to guarantee the full effectiveness of the final future decision that will be made in the main action (in this case an action for annulment), to which the interlocutory proceedings are an adjunct (order of the Vice-President of the Court of 28 November 2013, EMA v InterMune UK and Others, C‑390/13 P(R), EU:C:2013:795, paragraph 50). By contrast, the situation is different where it is already clear, when the assessment is carried out by the judge hearing the application for interim measures, that, in view of its nature and the manner in which it will foreseeably occur, the harm alleged, should it occur, may not be adequately identified or quantified and that, in practice, it will not therefore be possible to make good that harm by bringing an action for damages (order of the Vice-President of the Court of 28 November 2013, EMA v InterMune UK and Others, C‑390/13 P(R), EU:C:2013:795, paragraph 51). In the present case, it must be stated that it appears to the judge hearing the application for interim measures that, in view of its nature and the manner in which it will foreseeably occur, the harm alleged, should it occur, may not be adequately determined and that, in practice, it will not therefore be possible to make good that harm by bringing an action for damages. Contrary to the argument put forward by the Commission, it is in fact not clear to the judge hearing applications for interim measures that that damage can be quantified, in particular by evaluating the extent to which the applicant suffered the loss of an opportunity to conclude new contracts, in so far as the prospect of concluding new contracts is uncertain and unforeseeable and based on subjective factors, in particular discretionary decisions of public authorities. As a result, it would be impossible to identify which contracts the applicant would have had a probability of being awarded and thus determine the damage suffered. Furthermore, it should be added that, as regards the risk of losing contract opportunities for partner firms that are members of the network to which the applicant also belongs, the range of the public and private organisations concerned is unknown. Lastly, such damage is, a priori, irreversible since, once the information contained in the publication concerned has been made available, its non-public nature can no longer be restored, even if the applicant’s action in the main proceedings were ultimately upheld. The Commission’s reasoning that the damage allegedly suffered by the applicant could be effectively remedied by the subsequent publication by the Commission of information relating to its exoneration does not cast doubt on that conclusion. By subsequently publishing information relating to the applicant’s exoneration, the Commission could not ensure that the same public which, for two and a half years, had had access to the information concerned would be informed of that exoneration. In view of the foregoing considerations, it must be found that the condition relating to urgency is satisfied in the present case, since the likelihood of the applicant suffering serious and irreparable damage has been established to the requisite legal standard. Balance of interests According to the case-law, in weighing up the different interests involved, the court hearing the application for interim relief has to determine, in particular, whether or not the interest of the party seeking suspension of operation of the contested measure in securing that suspension outweighs the interest in the immediate application of the measure, by examining, more specifically, whether the possible annulment of the measure by the court when ruling on the main application would allow the situation that would be brought about by its immediate implementation to be reversed and, conversely, whether suspension of operation of the measure would prevent it from being fully effective in the event of the main action being dismissed (see order of 11 March 2013, Iranian Offshore Engineering & Construction v Council, T‑110/12 R, EU:T:2013:118, paragraph 33 and the case-law cited). It is therefore necessary to examine whether the applicant’s interests in obtaining the immediate suspension of Article 2 of the contested decision, in so far as that article provides for the publication on the Commission’s website of certain information relating to the applicant’s exclusion from participation in award procedures, outweigh those pursued by the Commission in adopting that decision. As regards the interests pursued by the applicant, in the first place, the latter claims that suspension of the publication at issue will not prevent the contested decision from being fully effective, in so far as it does not seek suspension of the exclusion itself, only suspension of the publication of the information in relation thereto. In the second place, the applicant claims that the financial interests of the European Union are protected, according to recital 105 of Regulation 2024/2509, by the EDES database. Publication does not in itself constitute direct and immediate protection against the risks of financial loss for the European Union. It seeks only to achieve a deterrent effect. In the third place, the applicant argues that it will be registered in the EDES database, with the result that the financial interests of the European Union will continue to be protected. The Commission will also remain free to publish the decision after the Court has heard the main application. Furthermore, the grant of suspension of publication amounts only to maintaining the status quo for a limited period. By contrast, according to the applicant, should publication not be suspended, the applicant faces the prospect of serious and irreparable damage. The annulment of the contested decision will not, in the applicant’s submission, have the effect of reversing the damage caused by publication, as the information will have been accessible to the public for some time prior to the annulment, with the consequent reputational and economic costs that entails. The non-public nature of that information cannot be restored, even if the action for annulment is upheld. In the fourth place, the applicant maintains that, if the interim measure sought were to be refused, its fundamental right to effective judicial protection, as well as its right to an effective remedy, would be rendered illusory. Any judgment annulling the contested decision would be deprived of practical effect since the damage would not be able adequately to be compensated. In so far as concerns the Commission’s interest, the latter argues that, in recitals 93 to 95 of the contested decision, the authorising officer by delegation specifically justified why the publication was appropriate in the present case. It did so by separately stating the specific and general deterrence reasons deemed applicable. In particular, the authorising officer by delegation considered that it was appropriate to decide that the information related to the exclusion is published on the website of the Commission for specific deterrence purposes, with a view to avoiding the repetition of the misconduct by the applicant, and for general deterrence purposes, notably to warn other entities active in the same field of business of the consequences of committing the same or similar misconduct, when participating in a tender procedure financed by the EU budget. Consequently, the Commission claims that, should the suspension of the publication decision be granted by the Court, those deterrence aims and the related protection of the financial interests of the European Union would be undermined. It is in fact highly probable that the duration of the judicial proceedings in the action for annulment will extend beyond the date of expiration of the publication and, accordingly, the possibility of publishing would be compromised. In view of the seriousness of the misconduct at issue and the risk to the EU budget resulting from the possibility that the applicant in the present case or other applicants in selection procedures for the award of contracts could mislead other authorising officers responsible, by providing incomplete information, the Commission submits that the interest in maintaining the operation of Article 2 of the contested decision in order to reinforce the general and specific deterrent effects of the publication clearly outweighs the interests of the applicant. Furthermore, the Commission claims that, in the event of a judgment of the Court annulling the publication, the applicant could obtain, on the one hand, adequate financial compensation for any material damage possibly unjustly caused. On the other hand, the Commission commits to repair the unjust damage to the applicant’s reputation suffered because of the publication by publishing on its public website a notice of the outcome of the final judgment for the period of two and a half years, in accordance with the third subparagraph of Article 142(1) of Regulation 2024/2509. The Commission concludes that, in the absence of the possibility of late publication and in case of suspension, the publication would be made impossible or the period of publication significantly shortened, which would considerably reduce the dissuasive function of the exclusion. In that regard, in the first place, it should be borne in mind that what is at issue in the present case is the publication of information outside the institutions of the European Union which is likely to have a significant impact on the applicant’s reputation and, consequently, on the possibilities of carrying on its activities. In addition, it should be noted that the objective pursued by the publication is to achieve a deterrent effect on the applicant and that publication does not in itself constitute direct and immediate protection against the risks of financial loss for the European Union. The financial interests of the European Union are protected, according to recital 105 of Regulation 2024/2509, by EDES. In the present case, in accordance with recital 92 of the contested decision, the applicant must be entered in the EDES database for the duration of the exclusion. In the second place, it should be noted that, in the absence of suspension of the publication on the Commission’s website of certain information relating to the exclusion of the applicant, the applicant’s fundamental right to effective judicial protection and its right to an effective remedy would only be illusory, since, once the information has been made available, its non-public nature could no longer be restored, even if the applicant’s action in the main proceedings were ultimately upheld. The General Court will be called upon to rule, in the main proceedings, on whether the contested decision, by which the Commission ordered, inter alia, the publication of the information at issue, must be annulled. If the publication of the information in question were not suspended, any judgment annulling the decision would be deprived of any practical effect as regards the damage caused to the applicant as a result of that publication. The Commission’s reasoning that, if the publication decision were suspended, it could never be enforced and would therefore be completely ineffective, since it is likely that the decision bringing an end to the proceedings dealing with the substance of the case will be delivered after the exclusion has ended, cannot call that conclusion into question. Otherwise, if the publication decision were not suspended, the applicant’s fundamental right to effective judicial protection and its right to an effective remedy would not be sufficiently guaranteed, for the reasons set out in paragraph 80 above. Lastly, if the action in the main proceedings were dismissed, even though the fourth subparagraph of Article 142(1) of Regulation 2024/2509 provides that the information published is to be removed as soon as the exclusion has ended, that provision does not expressly prevent the Commission, in the light of Article 266 TFEU, from subsequently publishing information relating to the applicant’s exclusion, after the decision in the main proceedings has been delivered. In the light of the foregoing, it must be concluded that the interest defended by the applicant must prevail over the interest in the dismissal of the application for interim measures, especially since the grant of the suspension of operation sought will amount only to maintaining the status quo for a limited period in time. Conclusion It follows from all the foregoing considerations that the application for interim measures must be granted and that the operation of Article 2 of the contested decision must be suspended in so far as it provides for the publication on the Commission’s website of information relating to the exclusion of the applicant from participating in award procedures governed by Regulation 2024/2509. Since the present order closes the proceedings for interim measures, the order of 19 June 2026, TH v Commission (T‑330/26 R, not published), adopted on the basis of Article 157(2) of the Rules of Procedure, pursuant to which the Commission was ordered to suspend the operation of Article 2 of the contested decision until the date of the order terminating the present proceedings, must be cancelled. Costs Under Article 158(5) of the Rules of Procedure, the costs are to be reserved. On those grounds, THE PRESIDENT OF THE GENERAL COURT hereby orders: 1. The operation of Article 2 of Commission Decision Ares(2026) 3019837 of 20 March 2026, excluding TH from participating in award procedures governed by Regulation (EU, Euratom) 2024/2509 of the European Parliament and of the Council of 23 September 2024 on the financial rules applicable to the general budget of the Union, and from being selected to implement EU funds, is suspended. 2. The order of 19 June 2026, TH v Commission (T‑330/26 R), is cancelled. 3. The costs are reserved. Luxembourg, 14 September 2026. V. Di Bucci M. van der Woude Registrar President Language of the case: English. Confidential information redacted.